Don’t Let Control Panels Slow Your Next Program
See how our growing capacity keeps your builds on schedule, from today’s volume to 1,500 panels a week by early 2027.

The demand for control panels has never been higher, and neither has our output. In this edition of Panel Notes, we’re taking you inside our growth, sharing what’s driving demand across the country, and showing you where our capacity is headed in 2027.
Over the past two years, our Tampa Bay facility has gone from building custom panels to running true high volume production, without giving up the quality and attention that got us here. Today, our team of engineers, technicians and production specialists ships 250 to 350 control panels every week. Lead times of 4 to 10 weeks are met run after run, many production runs ship ahead of schedule, and we have zero field failures to date.
Growth built on names you might know
Our 2025 to 2026 growth comes from partners who can’t afford downtime:
A leading data center cooling manufacturer. We build cooling controls at extreme high volume for data center thermal management, including panels for units serving Microsoft and Meta.
Panera Bread. An eight year OEM partnership with thousands of standardized, repeat builds shipped to locations nationwide, every one built to the same standard.
Walt Disney. Custom monorail control panels, where safety, reliability and uptime are non negotiable.
Yuengling Brewery. Controls that keep continuous bottling line production running at America’s oldest brewery’s Tampa operation.
The Bigger Picture: Data center construction just hit another record
Our growth is happening alongside a nationwide boom. According to ConstructConnect’s November 2026 Data Center Report, U.S. data center construction starts reached $135.8 billion through September across 178 projects. August alone came in at $25.8 billion, the largest single month on record.
The buildout is spreading, too. New projects are moving away from the coasts and into the South and Midwest, with Texas leading the way in planned spending.
AI servers run hotter than anything before them, and that’s pushing data centers toward liquid cooling faster than the industry expected. Cooling manufacturers are expanding their factories to keep up, and coolant distribution units (CDUs) have been called out as a supply bottleneck.
Every CDU, CRAH, fan wall and chiller needs a control panel. As cooling manufacturers ramp up, their panel supplier has to ramp with them. That’s exactly what we’ve built IIC to do.
1,000 to 1,500 panels per week by Q1 2027

We’re scaling so our partners never have to wait on us.
By the first quarter of 2027, our weekly capacity will grow to 1,000 to 1,500 panels, up to four times what we ship today.
We’re getting there by continuing to invest in three areas: the systems that track every build, the processes that make every build repeatable, and the people who do the work. With access to the deep Tampa Bay workforce, we can grow our team as fast as our customers grow their programs.
Every panel we build goes through the same process, whether it’s the first of a prototype run or the thousandth of a production order:
Traceable components from trusted brands including Phoenix Contact, Siemens, Schneider Electric, Weidmüller, Rittal and ABB
Full UL 508A documentation on every build
QC testing across five departments before a panel ever reaches Final QC
Factory acceptance testing (FAT) for prototype programs

Our capabilities
One accountable team handles everything from engineering to startup, so you have one partner and one point of contact from start to finish.
Electrical control panels for CDU, CRAH, CRAC, Fan Wall, AHU, Chiller and Coil Wall applications
Pump and dry cooler application panels
Motor control centers (MCC)
Build to print or full turnkey design and fabrication
In house electrical engineering and CAD design
Field startup, commissioning, retrofits and panel repair
What this means for you
Room for your biggest orders. Our capacity is already built, so a large order doesn’t mean a long wait.
Schedules you can plan around. Consistent lead times mean your production line keeps moving.
Quality you can verify. Documented, repeatable builds mean panel one and panel one thousand match.
One partner as you grow. As your volume increases, you won’t need to find, qualify and onboard a second supplier.
Ready to scale your 2027 program?
If you’re planning next year’s builds, now is the time to talk. Send us your build specs, expected volumes and timeline, and our team will walk you through capacity and lead times for your program.
Talk to Our TeamLink: mailto:Sales@iicontrols.com
[TEXT BLOCK: Paragraph]Call 727.216.6416 · Email Sales@iicontrols.com · Visit inf-ind.com




Comments